Overhaul. Stage second: mount the wiring, install the euro sockets and switches, align the walls.
It is better to start this stage with the replacement of electricians, having previously determined the places where the euro outlets need to be installed. The wires are brought to them, but the euro of the sockets have not yet been placed. And, of course, the wires in no case should be connected to the shield.
There are quite a lot of rosettes in the kitchen room, because there are a lot of electrical appliances – microwave, TV, kitchen combine, refrigerator, hood and so on. Wiring to kitchen outlets is laid by a thick wire corresponding to the load. This wire is connected to the electrical panel with an additional wire.
Electrically euro sockets in the corridor are usually installed under the vacuum cleaner and lamp. In addition, there should be a socket for the phone and exit for the antenna cable.
If you plan to replace heating, it should be borne in mind that it will be accompanied. So, a lot of dust and garbage will appear in the room. Therefore, it is better to replace the radiators at once, remove the garbage and start aligning the ceilings, walls and floor. You need to carefully check the places of docking the walls and panels for the presence of voids between them. The walls are tapped, extinguished, and if the voids are detected, they must be carefully close. This will help improve heat and sound insulation.
The corners between the floor and the walls also need to be checked – they should be straight. Otherwise, the corners must be leveled, otherwise the skirting boards will not lie down tightly, and the cracks are formed.
After the walls are leveled, the euro installation of euros and switches are coming. After that, you can start replacing doors, windows and window sills. Of course, both the walls and ceilings and the floors should already be even, then the doors and windows will stand for sure. Then the ceiling is putty and whitens, they are covered, cycle and floated with varnish floors. After all these works, there is a turn of wallpaper. Before starting their gluing, you need to de -energize the room and remove the covers from the euro of the outlets and switches. On the rolls of the wallpaper, the locations of sockets and switches are noted, then the marks are cut, and the covers from switches and euros of sockets are put to their previous places. Now you can connect electricity and start pasting walls with wallpaper. But we will talk about this already in the next article ..