Currently, offices repair is a fairly popular service. This process includes several main stages:
Removing the size of the room, development of a design project and its approval;
Compilation of estimates, which also includes the approval of building materials. If redevelopment or change in the facade is required, then it is necessary to obtain permission in the relevant authorities;
Directly repair and finishing work.
In the process of developing an office design project, experts pay special attention to creating an original style using corporate colors, symbols. At the same time, it is extremely important to observe all sanitary standards. Much depends on the design of the room: both the atmosphere in the team and the image of the company itself.
The creation of a design project at the final stage implies its coordination with the customer. The project must be mandatory to display work on the installation of plumbing communications, conducting electrical wiring, wall transfer, creation of partitions, etc. D.
As a rule, several typical layouts are used for offices:
Open space (or Openspase);
closed space;
Combined space.
The open type of office is a large zoned room in which all employees are in sight of each other. Closed office type is a room divided into separate rooms. In the mixed type, both of these options are organically combined with each other. It is this option that is most preferable for most managers.
The selection of convenient, functional and stylish furniture should be carried out at the early stage. In this case, the designer will be easier to create an office design project, determining the color scheme of the room, interior style, etc. D.
Office repair is a multi-stage process, which must in absolute accuracy correspond to the design project approved by the customer. Typically, the contractor (repair company) assumes the task of choosing and purchasing all the necessary building materials, as well as their delivery and unloading.
The selection of materials for repairs in the office is a rather responsible task, and at this stage it is impossible to save. All building materials should be high -quality, safe and have all the necessary certificates that confirm their resistance to damage, wear, damage.